Tepal project

Work Plan

The company is currently completing a strategic desktop analysis of all historical drilling and test work done at Tepal with plans on drilling targets in the second half of 2020. Areas of focus include the recently defined Mid Zone, a zone of advanced alteration located adjacent to the North and South conceptual pits; The Off-Tizate and North Tizate targets represent high-grade “feeder” targets that have demonstrated high grade Au-Ag results in drilling and are underlain by a strong IP Chargeability response.